Overview
The Gap Underbridge Replacement is a landmark project that has significantly enhanced the safety and reliability of the rail network at Werris Creek. Our Tamworth team provided geotechnical services for valued clients ARTC, John Holland and Boral. The project involved replacing a life-expired steel rail bridge with a new concrete ballast top structure. This upgrade ensures the bridge meets modern safety standards and can accommodate increased rail traffic, contributing to the long-term efficiency and resilience of the Hunter Valley rail network.
The project’s execution was a feat of engineering and coordination. During a scheduled 96-hour track closedown in early August 2024, teams worked tirelessly to dismantle the old bridge and install the new structure. The replacement included a 5-span, 80-metre-long concrete bridge and the construction of 160 metres of new track. Despite the tight timeframe, the teams completed the work efficiently, and the new bridge is now fully operational, ready to support future rail operations with enhanced performance and reliability.

Our Tamworth team played a critical role in ensuring the success of this project by providing expert geotechnical inspection, field density testing, and concrete testing services. These services were essential in verifying the quality and compliance of materials and construction processes, ensuring that the bridge’s foundation and structure met stringent safety and durability standards.